When building a
SeaGate home on your lot in Palm Coast
Providing answers to commonly asked questions about
everything from transferring the title to providing us with a loan commitment.
Q. When do I have to provide you with a written loan
commitment?
A. Our Purchase and Sales Agreement requires that
you make loan application within ten days. If you prefer the convenience of
using our preferred lender, First Rate Home Mortgage, they will automatically
send us a copy of your loan commitment. If you elect to use another lender, you
will be responsible for providing us with a written loan commitment. Your New
Home Consultant will be your primary contact. Please provide a copy of your
loan commitment to your New Home Sales Consultant.
Q. I already own my lot. How do I transfer it over to
you so that you may start the building process for my new home?
A. Please contact us at 386.246.6109 to
make arrangements to sign and notarize a warranty deed assigning the home
site to us.
Q. At the time I purchased my lot, a bore test was
done. Do I need to have another test performed?
A. If you have a bore test dated less than one year
ago, we should be able to use it. If the test was performed beyond one
year, a new test will be required.
Q. When will I be asked to select colors and interior
appointments at the Design Studio?
A. As we get closer to the permitting stage, you
will receive a call from your Design Consultant who will make an appointment
for you to come in and finalize the design choices for your new home.
Please allow up to three hours for this process. During your appointment
you will have the opportunity to select from an array of interior and exterior
design selections. If you select options and plan to finance them, please
contact your lender immediately so they may update your loan.
Q. Can changes be made after my options are selected?
A. As you can imagine, there is a great deal of
coordination required to build a home. Once selections are made, changes cannot
be made.
Q. When will my home be permitted?
A. Prior to architectural plans being drawn,
numerous documents are needed. These may include surveys, bore tests,
information from utility providers or a plat being recorded. Plans must then be
drawn reflecting the structural, electrical and plumbing changes that you may
have requested. Once engineered truss drawings are ordered and final
plans are completed they are sent to engineering for review. After the
architectural plans are approved and sealed by engineering, a permit
application is prepared and submitted to the city. This process may take
several months depending on a variety of factors.
Q. When will construction of my home begin?
A. After a permit is issued, purchase orders are
created for the clearing, filling, grading and compaction of your home site.
This may take several weeks, depending on conditions. Once the home site has
received final compaction, is ready for building and if all bids are received
and approved, purchase orders are finalized for the labor and materials needed
to build your home. Copies of plans and work orders are assembled and
distributed to all applicable subcontractors and the Construction Manager. Now
that we are ready to begin construction, a Customer Service Coordinator will
call you to set up your Pre-Start Orientation. At the Pre-Start Orientation you
will have the opportunity to meet your Construction Manager and review the
plans, specifications and color selections for your new home. During the
construction of your home, should you have any questions regarding the
construction of your home, please contact Customer Service Coordinator at
386.246.6168.
Q. SeaGate Homes is purchasing a home site for us or
we are deeding our home site to SeaGate Homes. How are costs
associated with the acquisition of the home site or additional impact fees
above our allowances handled?
A. Unless your purchase and sales agreement was
written after June 13, 2005 and states otherwise, you may receive addenda for
impact fees, taxes or third-party lot acquisition costs. If you have
asked us to acquire a lot for you, upon the lot closing you will receive an
addendum for the closing costs associated with the acquisition of the
property. These costs would likely be pro-rated property taxes, closing
costs or mortgage payoffs if it was your lot and had an outstanding mortgage
balance. When the permit for your new home is received, you may
receive an addendum if the impact fees exceed the allowances in your Purchase
and Sale Agreement. If you would like these charges included with your
mortgage, you will need to forward a copy of these addenda to your mortgage
consultant.
Q. Can I have work performed on my home prior to the
Closing?
A. All work performed must be done through
SeaGate’s licensed, insured and approved vendors and must be included in your
Purchase and Sale Agreement.
Q. May I visit the home while it is under
construction?
A. There are three informative pre-scheduled visits
during the construction process where we orient you on the progress of your
home to date. Your Customer Service Coordinator will contact you in advance to
set an appointment for these visits. The first pre-scheduled visit is the
Framing Orientation. We will review items such as cable and phone outlet
locations and answer questions that you may have. The second
pre-scheduled visit will be the New Home Orientation, which will be held prior
to closing. At this time we will acquaint you with all of the systems in
your new home and demonstrate how everything is operated. Then, typically just
prior to closing we will review the finished home with you a second time to
address any items noted on your prior orientation. Should you decide to visit
the home outside of these pre-scheduled visits, please contact your New Home
Consultant to see if an appointment can be arranged. For safety reasons a
SeaGate team member must always accompany you to the site.
Q. At times it appears as if no one is working on my
home.
A. There may be periods of inactivity while we are
waiting for inspections, materials or the next craftsman to work on your
home. Other times there may be an item being completed that is not
noticeable without intimate knowledge of the construction process. Please
be assured that the completion of your home in a timely manner is a priority
for us.
Q. Should I lock in my mortgage?
A. Because everyone’s financial situation is
different, we are unable to advise you as to when or if you should lock in your
mortgage. There are also many factors that affect the permitting and
construction schedules of your home, including but not limited to materials,
labor and weather. We suggest that you discuss lock-in programs with your
mortgage consultant or financial advisor.
Q. I’ve noticed a few items in my home that need to be
addressed. When will these items be taken care of?
A. Your Construction Manager and other members
of the SeaGate team are frequently in and out of your new home performing
the many different inspections that occur during the building process.
During these inspections items are noted and forwarded to each
subcontractor. There are then scheduled finishing periods for your new
home when subcontractors will address any items in the appropriate order as the
home nears completion.
Items that typically get taken care of just prior to completion:
-
Exterior Doors: Dents, gaps, weather-stripping, painting and temporary lock
replaced.
-
Interior Doors/Closet Doors/Cabinet Doors: Gaps at top or bottom, misalignment
and operation, missing hardware or trim.
-
Windows: Locks, frames, glass, operation and cleaning.
-
Screens: Installed on all operable windows and sliding glass doors unless doors
are behind lanai screen enclosures.
-
Drywall: Inspected for holes, waves or uneven finish.
-
Paint: Interior and exterior checked for coverage and paint removed from
any surfaces, if necessary.
-
Bath Accessories: Inspected for damage, location and caulked.
-
Stucco: Inspected for cracks and finish.
-
Shoe Moulding on Vinyl Floor Areas: Installed after final interior painting.
-
Concrete/Flatwork: Inspected for vertical displacement, also width and depth of
cracks, which are very common due to the curing process of concrete.
-
Garage Step at Service Door, if applicable: Poured with sidewalk and driveway.
-
Garage Floor: Pressure cleaned and inspected for water displacement.
-
Grass: Watered after installation and until closing.
-
Outlets: Locations checked, wiring completed and plate covers installed.
-
Roof: Inspected deflection and workmanship.
Q. I’ve noticed some things in my home that are
different from the model.
A. Code changes and changes in the supplier or
manufacturer most often account for differences.
Q. When will my home be completed?
A. Our construction schedules allow for 4 to 6
months, however, there are a variety of factors that affect your home’s
construction schedule on a daily basis. We will be sending you a letter
approximately 45 to 75 days prior to the anticipated closing to help you begin
making the final arrangements for the closing of your new home.
Q. When will I be given a date for closing?
A. Closing dates are typically scheduled once the
counter tops have been installed and your driveway has been completed.
Usually when these milestones occur you are approximately 30-45 days from
closing. You will be contacted by our Closing Department to schedule the
date, time and location for the closing.